Print

The history

1964: the first petrol was transmitted on petrol pipe “Unecha-Polotsk-1” to Polotsk oil refinery by petrol pipe transport

1967: Polotsk direction of petrol pipe “Druzhba” was founded by order of Lvov administration of trunk petrol pipes “Druzhba #363 from 13.10.67

1968: building and filling of lineal part of petrol pipe “Polotsk-Ventspils” was over. First tons of petrol transmitted onto petrol terminal of Ventspils for unloading for export

1976: Petrol pipe “Unecha-Polotsk-2” was put into operation. Petrol transporting on petrol pipes “Unecha-Polotsk-1,2” achieved 40 tons a year.

1978: building of petrol pipe “Polotsk-Birzhay-Mazheklay” was over. The second line of oil-refining station “Polotsk” was put into operation

1981: building of petrol pipe “Surgut-Polotsk” was over and first petrol came into pools of oil-refining station “Polotsk”

1983: building of pool park for transmitted petrol on oil-refining station “Polotsk” was over. The whole storage capacity was about 490000m3

1988: petrol transporting to Novopolotsk petroleum refinery, Mazheklaysk petroleum refinery, and to Ventspils ports achieved its maximum – 55 mln tons per year

1999: Novopolotsk Company of petrol transporting “Druzhba” was renamed into Novopolotsk Republic Unitary Enterprise of petrol transporting “Druzhba”

On the 1 of January 2003 Publicly traded company “Transpetrol” decided to stop supply of petrol to Ventspils

August 2006: supply of petrol stopped to the direction of Mazheklay

December 2010: Novopolotsk Republic Unitary Enterprise of petrol transporting “Druzhba” was reorganized into Publicly traded company “Polotsktranspetrol Druzhba”

January 2013: created the Base of Production Servicing.

2014: Design and budget documentation was developed, the project "Construction of the Main Oil Product Pipeline "Novopolotsk-Fanipol" was launched

October 2015: a new production structural subdivision was created - the Head Oil Product Pipeline station "Polotsk"

December 2016: the 1st launch complex of the Main Oil Product Pipeline "Novopolotsk-Fanipol" was put into operation

October 13, 2017: 50th anniversary of the establishment of the company

December 2018: the 2nd launch complex of the Main Oil Product Pipeline "Novopolotsk-Fanipol" was put into operation